STAIRS: Most departments layout with a 2’ foot square and stair guides, or with a large bevel square. This method combined with a need to layout each individual stair pan or clip is an enormous waste of company time. Using assembly techniques that are presumed to be standard and adequate procedure in this department is vastly consuming company profit.
Increase Production by Up to 300% with Proven Time Saving Techniques.
Incorporate faster layout tools and assembly methods that will end company waste.
HANDRAIL: Most departments layout stair rail, then cut and/or fit according to that layout. This method is extremely unnecessary and is the biggest offender of company loss. The vast number of techniques utilized in the handrail process can be excessive and time consuming if standard methods are applied.
Increase Production by Up to 600% with Proven Time Saving Techniques.
Eliminate the layout process and start using superior cutting and assembly techniques.
STRUCTURAL: The most experienced workers are too often set in their ways, using habits and techniques that neglect company time. These time consuming techniques and poor work habits are unfortunately accepted as standard procedure and taught to your new trainees today.
Increase Production by Up to 200% with Proven Time Saving Techniques.
This department usually has no specific system. Employees are free to do whatever seems appropriate. Work habits and techniques too often vary in skill levels and are vastly consuming company profit. Instill time saving techniques that you can incorporate as company policy.
MISCELLANEOUS: Workers spending the day on a trash gate or a couple of ladders is not uncommon.
Increase Production by Up to 200% with Proven Time Saving Techniques.
This department usually has no specific system. Employees are free to do whatever seems appropriate. Work habits and techniques too often vary in skill levels resulting in an excessive amount of wasted time. Instill time saving techniques that you can incorporate as company policy and eliminate diversity.
HELPERS: Experienced helpers are taking 3 to 4 times longer than necessary to grind standard welds, handrail, beam copes and rat holes. Improper hole drilling techniques that too often create misaligned bolted connections in the field that result in even more lost time.
Increase Production by Up to 400% with Proven Time Saving Techniques.
Helpers often feel they are not a vital asset to the Company, their motivation levels are typically lower due to this assumption. Work habits and techniques too often vary in skill levels. This however is not their fault; they’re only doing what they’ve been taught. Instill time saving techniques that you can incorporate as company policy and let’s end company waste today.